|
|
|
|
|
New tunnel installed. I had to add a 'kickout' to box around the reverse lockout solenoid that wasn't on the trans when I test fitted (Ooops!). I then sealed the added box-out as I did the rest of the tunnel to the floor.
|
|
|
|
|
|
|
|
|
|
After installing the repro front console bracket & adapting the rear console mount, I installed new carpet (plenty of material to fit the taller tunnel). The finishing touches of the Hurst stick & 6 speed shift ball (both from Hurst/Mr Gasket). The result is the "Restified" look.
|
|
|
|
|